Rehau Enwickelt in Deutschland. Ohne Kompromisse.

Case Study / Hot & cold water + Rapuiano Perth's children's hospital

Childrens Hospital

The $1.2 billion Perth Children’s Hospital project is set to offer the best possible clinical care for future generations. It will also provide a base for outstanding pediatric research. The 298 bed hospital will provide tertiary-level health services and secondary health services including inpatient and outpatient care and ambulatory services.

The RAUTITAN hot and cold water piping system was specified and installed throughout the project in sizes 16mm to 50mm. In addition the RAUPIANO Acoustic and Trade waste system was selected as the prime drainage material throughout.

 

REHAU Products were specified because of their quality, ease of use and support network. RAUTITAN Platinum was used for potable water, RAUTITAN lilac was used for recycled water, RAUPIANO Plus is used for Drainage.

Childrens Hospital
Childrens Hospital

Related Case Studies

Case study:

750 Orrong Rd, Toorak VIC

Read more

Case study:

Fiona Stanley Hospital, Perth WA

Read more